Site Utilities construction activity in Castle Rock
Underground water, sewer, storm, gas, and other site utility work.
Where is site utilities work showing up in Castle Rock?
ConstructionCurrent currently connects 247 projects and 87 permit records that directly reference or strongly indicate site utilities involvement in Castle Rock. There are 2 recent permit signals in the current dataset. Each result shows whether the match is source-backed or inferred.
Site Utilities activity by location
150 project matches in Castle Rock
U-Haul Kellogg Ct, sanitary sewer connection
11 KELLOGG COURT, CASTLE ROCK
The public record directly references site utilities work. Project signal (development project): The public record directly references site utilities work.
St. Francis of Assisi-sanitary sewer
2744 FIFTH STREET, UNINCORPORATED DOUGLAS COUNTY
The public record directly references site utilities work. Project signal (development project): The public record directly references site utilities work.
Fire Station 156 & Logistics Facility-san. sewer main
, CASTLE ROCK
The public record directly references site utilities work. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): The public record directly references site utilities work. Roadway projects can include utility relocation or drainage infrastructure.
Dawson Trails Offsite Sanitary Sewer Phase II
, CASTLE ROCK
The public record directly references site utilities work. Project signal (development project): The public record directly references site utilities work.
Villages @ CR Metro Distric No. 4 Sanitary Sewer Line
, CASTLE ROCK
The public record directly references site utilities work. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): The public record directly references site utilities work. Roadway projects can include utility relocation or drainage infrastructure.
Dawson Trails Offsite Sanitary Sewer Main and Interceptor
, CASTLE ROCK
The public record directly references site utilities work. Project signal (development project): The public record directly references site utilities work.
D1 Training, Meadows Town Center
, CASTLE ROCK
Site-development work commonly requires underground utilities.
Replat Grand Mere Plaza - SDP minor amendment
340 S WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
221 Wilcox Patio
221 N WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Rivers Church Facade Change
136 S WILCOX ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Dawson Trails PD Amendment No. 3
1363 CRYSTAL VALLEY PKWY, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Sandstone Adolescent In-Patient Mental Heath Care
864 BARRANCA DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Meadows 17 Little Sunshine's Playhouse Amendment
3773 LIMELIGHT AVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
310 N Wilcox St. Facade
310 N WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
StorHaus SDP 2nd Amendment
4390 REGENT STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
QuikTrip on Wolfensberger Road
107 WOLFENSBERGER RD, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Non Material Amd for Monument Sign
1151 ALOHA ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Linked permit 23-3752: New construction often requires utility connections or site utilities.
Castle Park West L3 - La Quinta Hotel to Wellspring Housing
884 PARK STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Bellco Credit Union - ATM Non-Material
4611 MILESTONE LANE, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Snarf's Site Improvements
619 N WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
downtown façade for Victorian Center, "The Silo"
611 N WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
RHG Gilbert Street Warehouse Remodel
17 S GILBERT ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Castleton Heights Multi-Family
3161 N CASTLETON COURT, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Founders Village F21 The Enclave SDP A3
5506 CANYON VIEW DR, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Castle Oaks Church Parking Lot Expansion
826 PARK STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
The Rock Church - Classroom Modular
4881 CHEROKEE DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Dairy Queen Exterior Freezer
132 S Wilcox Street, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Founders Pool Pavilion
4501 ENDERUD BOULEVARD, CASTLE ROCK
Site-development work commonly requires underground utilities. Linked permit 18-4253: New construction often requires utility connections or site utilities.
U-Haul SDP amendment for Canopy located at Burt
2269 MANATT CT, CASTLE ROCK
Site-development work commonly requires underground utilities.
WITHDRAWN Kohl's EV Charging Stations
4800 MILESTONE LANE, CASTLE ROCK
Site-development work commonly requires underground utilities.
Project SDP21-0058
6384 PROMENADE PARKWAY, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
World Compass Academy Parking Expansion
2490 S PERRY STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Withdrawn now under USR24-0001
3952 BUTTERFIELD CROSSING DR, CASTLE ROCK
Site-development work commonly requires underground utilities.
Berkenkotter RV Sales (Brookside Circle)
1070 BROOKSIDE CIR, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
St. Francis of Assisi Planned Development Zoning
2746 FIFTH ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
512 N Wilcox SDP
512 N WILCOX ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Philip S. Miller Park Small Cell Amdendment
1375 W PLUM CREEK PARKWAY, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Rivian Charging Stations
5050 FACTORY SHOPS BLVD., CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Encore - Commerce Bank Tenant Improvement
20 WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
Renaissance Charter School Yurt
3960 TRAIL BOSS LANE, CASTLE ROCK
Site-development work commonly requires underground utilities.
QuikTrip on Wilcox Street
407 S. Wilcox, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Limelight Commercial Center
3979 LIMELIGHT AVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Academy Charter School - Shade Shelter
1551 PRAIRIE HAWK DR, CASTLE ROCK
Site-development work commonly requires underground utilities.
Walmart Expansion
133 SAM WALTON LANE, CASTLE ROCK
Site-development work commonly requires underground utilities.
Promenade Inline Retail Building
5935 PROMENADE PKWY, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
The Meadows Castle Rock Restaurant amd 1
3673 BILLBER, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
The Brickyard Site Plan Amendment
401 PRAIRIE HAWK DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Chick-Fil-A By-Pass Lane
6353 PROMENADE PKWY, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Plum Creek Church Building Expansion
960 S INTERSTATE 25, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Sanders Business Park SDP Amendment
2770 S WILCOX ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
AdventHealth Castle Rock, Cancer Center Addition
2350 MEADOWS BOULEVARD, CASTLE ROCK
Site-development work commonly requires underground utilities.
DXD Storage Timbermill
TIMBER MILL PKWY, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Front Range Construction Services SDP Amendment No. 1
661 PRAIRIE HAWK DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities.
Bella Mesa South Townhomes
145 INNOVA LN, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Hillside at Castle Rock-SDP Amendment-Phase 3&4
1847 GRAYSIDE CIRCLE CIR, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Scileppi's Phase 2
210 THIRD STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Circle K SDP Amendment
310 S WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
Unity on Wolfensberger Multi-Family (Wellspring)
200 WOLFENSBERGER ROAD, CASTLE ROCK
Site-development work commonly requires underground utilities.
O'Reilly Auto Parts
730 N RIDGE RD, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Southern Veterinary Partners SDP Amendment
425 S WILCOX STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
Advent Health Hospital MOB #3 - Amd 3 Non-Material
2350 MEADOWS BOULEVARD, CASTLE ROCK
Site-development work commonly requires underground utilities.
Taft House Pool Remodel and Site Update
3570 CELESTIAL AVE, CASTLE ROCK
Site-development work commonly requires underground utilities.
CR Outlets Pad B1 Amendment No. 15
5050 FACTORY SHOPS BOULEVARD 930, CASTLE ROCK
Site-development work commonly requires underground utilities.
Lazy Dog Restaurant Amendment, Promenade at Castle Rock
5892 CASTLEGATE DR WEST, CASTLE ROCK
Site-development work commonly requires underground utilities.
The Brickyard Mixed Use Development
401 PRAIRIE HAWK DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Walmart Fuel Station and Convenience Store
133 SAM WALTON LANE, CASTLE ROCK
Site-development work commonly requires underground utilities.
Los Dos Potrillos
6370 PROMENDADE PARKWAY, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
U-Haul Kellogg Ct Parking Space Additions
11 KELLOGG COURT, CASTLE ROCK
Site-development work commonly requires underground utilities.
City Hotel
419 N PERRY STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
3533 Timber Mill Parkway Shared Parking
3533 TIMBER MILL PARKWAY, CASTLE ROCK
Site-development work commonly requires underground utilities.
Murphy USA Fuel Station
186 METZLER DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities.
Little School on Perry Street
203 N PERRY STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
TO TEST AUTO EMAILS
3475 E STATE HIGHWAY 86, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Perry Street Social District - SDP Amendment
404 N PERRY STREET, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Downtown Circle K Redevelopment
310 S WILCOX ST, CASTLE ROCK
Site-development work commonly requires underground utilities.
Kompass at Montana Vista
MONTANA VISTA WAY, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Auburn Heights Apartments
1001 AUBURN DR, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Terrain North Basin Single Family Residential
2819 CASTLE OAKS DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Hillside at Castle Rock Am 2-Phases 3 & 4
1847 GRAYSIDE CIRCLE CIR, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
New Hope Subdivision
3737 NEW HOPE WAY, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
The Brickyard -Filing 1 Amendment 1
401 PRAIRIE HAWK DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Unity on Wolfensberger and Church-HH Subdivision Am 2 replat
200 WOLFENSBERGER ROAD, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
The Brickyard - public infrastructure plat, CRSC, Filing 1
401 PRAIRIE HAWK DRIVE, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Alexander Place PDP Amd 1
382 ALEXANDER PLACE, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Crystal Valley Ranch PD Amd #7
2355 CRYSTAL VALLEY PKWY, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Brickyard PD, 1st Amendment
401 PRAIRIE HAWK DR, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Meadows Medical PDP (New Hope MOB)
3737 NEW HOPE WAY, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
826 Park Street Expansion & 200 Wolfensberger Road PDP
200 WOLFENSBERGER ROAD, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
RidgeView Town Center Planned Development
895 N RIDGE RD, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Wellspring Community Planned Development Plan
498 WOLFENSBERGER ROAD, UNINCORPORATED DOUGLAS COUNTY
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
PS Miller PD Minor Amendment
212 FRONT STREET, CASTLE ROCK
Site-development work commonly requires underground utilities.
The Brickyard Mixed Use Development
401 PRAIRIE HAWK DR, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Auburn Ridge PD Plan and Zoning Amendment
1001 AUBURN DR, CASTLE ROCK
Site-development work commonly requires underground utilities.
Plum Creek Church Building Expansion
960 S INTERSTATE 25, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Wellspring and Covenant Church Annexation
498 WOLFENSBERGER ROAD, UNINCORPORATED DOUGLAS COUNTY
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Maher Ranch Tank Site Zoning
, UNINCORPORATED DOUGLAS COUNTY
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Brickyard Site Development Plan Amendment No. 2
, Castle Rock
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
DXD Storage Timbermill Site Plan Amendment
TIMBER MILL PKWY, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
The Meadows Healthspan Medical Office Building
, CASTLE ROCK
Site-development work commonly requires underground utilities.
Pine Canyon PA2 & 3
, UNINCORPORATED DOUGLAS COUNTY
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Oaks Filing 2B Site Development Plan Amd 1
, Castle Rock
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Gold Crown Field House - Dawson Trails
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Dawson Trails Apartments PA-D
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
This is a test
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Crystal Valley Ranch Single Family Detached
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Key Bank, Dawson Trails
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Heroes Hall
, Castle Rock
Site-development work commonly requires underground utilities.
Whataburger
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Limelight Center at the Meadows
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Costco Site Plan Amendment #1
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Findlay Toyota
, CASTLE ROCK
Site-development work commonly requires underground utilities.
Meadows Town Center Restaurant and Bar
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
King Soopers Dawson Trails
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
YardHomes Ridge View Site Plan
, Castle Rock
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Brinkerhoff and Bar Hummingbird SDP Amendment
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Dawson Trails Townhomes - Planning Area E2
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
AdventHealth Medical Office Building
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Bella Mesa North - Cardel Homes
, Castle Rock
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
TEST TEST TEST
, Castle Rock
Site-development work commonly requires underground utilities.
Woodspring Suites Promenade
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Soleana Alexander Way
, UNINCORPORATED DOUGLAS COUNTY
Site-development work commonly requires underground utilities.
Milestone Crossing Tesla EV Chargers
, CASTLE ROCK
Site-development work commonly requires underground utilities.
Canyons Far South Residential SDP
, CASTLE ROCK
Site-development work commonly requires underground utilities.
Dawson Trails Residential Neighborhood, Planning Area D
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Block 4 Containers
, CASTLE ROCK
Site-development work commonly requires underground utilities.
Dawson Trails Residential Neighborhood (PA B-1)
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Costco (Dawson Trails)
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
SDP for 3 custom homes Mt Royal
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Crystal Valley Ranch Paired Homes
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Scileppi's Addition
210 THIRD ST, CASTLE ROCK
Site-development work commonly requires underground utilities.
Eternal Rock Parking Lot and Landscaping
2 PHELPS ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Chateau Valley Site Development Plan
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Memmen Young-Founders Vista Site Development Plan
, Castle Rock
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Castle Oaks/Terrain Off-Street Trail Plan
2652 AUTUMN SAGE ST, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
Gilbert Subdivision, Advanced Property Maintenance
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Dawson Trails Filing No. 2, Amendment 5-PA E2 Townhomes
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Oaks Filing 2B, Filing 2 Amendment 1
, Castle Rock
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Soleana
, UNINCORPORATED DOUGLAS COUNTY
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Fire Station 156 & Logistics Facility
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Lynch Subdivision
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Dawson Trails Filing No. 3 Infrastructure
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Dawson Trails Residential, Infrastructure - Filing 2 Am 3
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Dawson Trails Residential, Planning Area D - Filing 2 Am 2
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Dawson Trails Residential Neighborhood (PA B-1)-F2 Am 1
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Canyons Far South Filing 2
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Canyons Far South Filing 1
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Costco (Dawson Trails) - easements
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
3 Custom Homes Mt Royal
, CASTLE ROCK
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.
Dawson Trails Planned Development Amendment #4
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
Liberty Village Minor PDP Amendment (Fire Station 156)
, CASTLE ROCK
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.