Hillside at Castle Rock-SDP Amendment-Phase 3&4
1847 GRAYSIDE CIRCLE CIR, CASTLE ROCK 80109
What is happening at 1847 GRAYSIDE CIRCLE CIR in CASTLE ROCK?
Hillside at Castle Rock-SDP Amendment-Phase 3&4 is a other projects project in CASTLE ROCK, Colorado, currently shown as PROJECTS. ConstructionCurrent connects 1 public timeline signal and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.
Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.
Project intelligence
The applicant is proposing a Site Development Plan amendment to Phase 3& 4 of the Hillside at Castle Rock SDP. This amendment will accommodate a different architectural product and enhance the buffer area between this development and the adjacent Hi
- Class
- OTHER PROJECTS
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250503307032
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Hillside at Castle Rock-SDP Amendment-Phase 3&4
The applicant is proposing a Site Development Plan amendment to Phase 3& 4 of the Hillside at Castle Rock SDP. This amendment will accommodate a different architectural product and enhance the buffer area between this development and the adjacent Hi
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.
Excavation / Grading
Site-development work commonly requires grading and earthwork. Project signal (development project): Site-development work commonly requires grading and earthwork.
See Excavation / Grading activity in CASTLE ROCK →Site Utilities
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
See Site Utilities activity in CASTLE ROCK →Concrete
Site-development work commonly includes concrete flatwork/curbs. Project signal (development project): Site-development work commonly includes concrete flatwork/curbs.
See Concrete activity in CASTLE ROCK →Landscaping
Site plans commonly include landscape installation/restoration. Project signal (development project): Site plans commonly include landscape installation/restoration.
See Landscaping activity in CASTLE ROCK →Paving / Asphalt
Site-development work commonly includes drives, roads, or parking areas. Project signal (development project): Site-development work commonly includes drives, roads, or parking areas.
See Paving / Asphalt activity in CASTLE ROCK →General Contractor
Site-development work often requires prime/overall construction coordination. Project signal (development project): Site-development work often requires prime/overall construction coordination.
See General Contractor activity in CASTLE ROCK →Irrigation
Landscape/site-development work may require irrigation systems. Project signal (development project): Landscape/site-development work may require irrigation systems.
See Irrigation activity in CASTLE ROCK →