CONNECTED PROJECT · SDP26-0034

RHG Gilbert Street Warehouse Remodel

17 S GILBERT ST, CASTLE ROCK 80104

RECENT SUBMITTALPENDING RESUBMITTAL2 sources
PROJECT ANSWER

What is happening at 17 S GILBERT ST in CASTLE ROCK?

RHG Gilbert Street Warehouse Remodel is a site development plan project in CASTLE ROCK, Colorado, currently shown as RECENT SUBMITTAL. ConstructionCurrent connects 5 public timeline signals and 4 related permit records on this page, plus likely trade involvement based on the connected evidence.

Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.

Project:OverviewTimelineTradesPermits
AT A GLANCE

Project intelligence

Reach Higher Ground is proposing a remodel that includes a 4,250-square-foot office/reception area, and a relocation of the south-side main entrance to an existing east-side entrance. The exterior changes include adding a sectional door with new curb

Class
SITE DEVELOPMENT PLAN
Reported valuation
—
Square feet
—
Parcel SPN
250511402011
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2021-07-08
permitSource fact

COMMERCIAL ROOF · 21-2694

COMMERCIAL REROOF STANDING METAL SEAM

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2021-07-28
permitSource fact

COMMERCIAL AC · 21-2972

GILBERT CONDOS REPLACE 6 AC UNITS

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2021-08-18
permitSource fact

COMMERCIAL DEMO · 21-3151

REACH HIGHER GROUND COMMERCIAL DEMO

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2024-09-05
permitSource fact

COMMERCIAL ROOF · 24-3389

PARTIAL REROOF METAL PRE-FINISHED SHEET AND COIL

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2026-11-09
development projectSource fact

RHG Gilbert Street Warehouse Remodel

Reach Higher Ground is proposing a remodel that includes a 4,250-square-foot office/reception area, and a relocation of the south-side main entrance to an existing east-side entrance. The exterior changes include adding a sectional door with new curb

PENDING RESUBMITTALCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.

Browse all trades →
Source-backed98%

Concrete

The public record directly references concrete work. Site-development work commonly includes concrete flatwork/curbs. Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): The public record directly references concrete work. Roadway/bridge work commonly includes concrete structures or flatwork.

See Concrete activity in CASTLE ROCK →
Source-backed98%

Demolition

Linked permit 21-3151: The public record directly references demolition work. Project signal (permit): The public record directly references demolition work.

See Demolition activity in CASTLE ROCK →
Source-backed98%

Doors / Hardware

The public record directly references doors / hardware work. Project signal (development project): The public record directly references doors / hardware work.

See Doors / Hardware activity in CASTLE ROCK →
Source-backed98%

Roofing

Linked permit 21-2694: The public record directly references roofing work. Linked permit 24-3389: The public record directly references roofing work. Project signal (permit): The public record directly references roofing work.

See Roofing activity in CASTLE ROCK →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.

See Paving / Asphalt activity in CASTLE ROCK →
Likely88%

Excavation / Grading

Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.

See Excavation / Grading activity in CASTLE ROCK →
Likely85%

Site Utilities

Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity in CASTLE ROCK →
Likely82%

General Contractor

Public roadway/transportation work typically requires prime construction coordination. Remodel/alteration work commonly requires coordinated construction management. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination. Remodel/alteration work commonly requires coordinated construction management.

See General Contractor activity in CASTLE ROCK →
Likely76%

Landscaping

Site plans commonly include landscape installation/restoration. Transportation projects often include landscape restoration. Project signal (development project): Transportation projects often include landscape restoration.

See Landscaping activity in CASTLE ROCK →
Likely70%

Electrical

Remodels often require electrical modifications. Project signal (development project): Remodels often require electrical modifications.

See Electrical activity in CASTLE ROCK →
Likely66%

Drywall

Remodels commonly include partitions/drywall. Project signal (development project): Remodels commonly include partitions/drywall.

See Drywall activity in CASTLE ROCK →
Likely66%

HVAC / Mechanical

Remodels often require HVAC/mechanical modifications. Project signal (development project): Remodels often require HVAC/mechanical modifications.

See HVAC / Mechanical activity in CASTLE ROCK →
RELATED PERMITS

4 permit records connected to this project