The applicant, TWG Development, is proposing to construct a new four-story multifamily building with 80 units. The proposed project is located southwest of the intersection of W Castleton Road and Castleton Court.
- Class
- SITE DEVELOPMENT PLAN
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 235127401032
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
TEMPORARY USE PERMIT · 21-2177
DAVEY JONES FIREWORKS STAND CASTLETON
Open authoritative source →Castleton Heights Multi-Family
The applicant, TWG Development, is proposing to construct a new four-story multifamily building with 80 units. The proposed project is located southwest of the intersection of W Castleton Road and Castleton Court.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.
See Paving / Asphalt activity →Excavation / Grading
Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.
See Concrete activity →Site Utilities
Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Landscaping
Site plans commonly include landscape installation/restoration. Transportation projects often include landscape restoration. Project signal (development project): Transportation projects often include landscape restoration.
See Landscaping activity →Irrigation
Landscape/site-development work may require irrigation systems.
See Irrigation activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.