Alexander Place PDP Amd 1
382 ALEXANDER PLACE, CASTLE ROCK 80108
What is happening at 382 ALEXANDER PLACE in CASTLE ROCK?
Alexander Place PDP Amd 1 is a planned development plan project in CASTLE ROCK, Colorado, currently shown as PROJECTS. ConstructionCurrent connects 1 public timeline signal and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.
Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.
Project intelligence
Alexander Place Investors, LLC, is proposing a PDP Amendment which incorporates the existing Alexander Place PDP combined with the existing Cooper-Hook PD-Integrated Business PDP into an overall 15.512 cohesive - Planned Development Plan (PDP). The
- Class
- PLANNED DEVELOPMENT PLAN
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 235126200003
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Alexander Place PDP Amd 1
Alexander Place Investors, LLC, is proposing a PDP Amendment which incorporates the existing Alexander Place PDP combined with the existing Cooper-Hook PD-Integrated Business PDP into an overall 15.512 cohesive - Planned Development Plan (PDP). The
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.
Excavation / Grading
Site-development work commonly requires grading and earthwork. Project signal (development project): Site-development work commonly requires grading and earthwork.
See Excavation / Grading activity in CASTLE ROCK →Site Utilities
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
See Site Utilities activity in CASTLE ROCK →Concrete
Site-development work commonly includes concrete flatwork/curbs. Project signal (development project): Site-development work commonly includes concrete flatwork/curbs.
See Concrete activity in CASTLE ROCK →Landscaping
Site plans commonly include landscape installation/restoration. Project signal (development project): Site plans commonly include landscape installation/restoration.
See Landscaping activity in CASTLE ROCK →Paving / Asphalt
Site-development work commonly includes drives, roads, or parking areas. Project signal (development project): Site-development work commonly includes drives, roads, or parking areas.
See Paving / Asphalt activity in CASTLE ROCK →General Contractor
Site-development work often requires prime/overall construction coordination. Project signal (development project): Site-development work often requires prime/overall construction coordination.
See General Contractor activity in CASTLE ROCK →Irrigation
Landscape/site-development work may require irrigation systems. Project signal (development project): Landscape/site-development work may require irrigation systems.
See Irrigation activity in CASTLE ROCK →