Encore - Commerce Bank Tenant Improvement
20 WILCOX STREET, CASTLE ROCK 80104
What is happening at 20 WILCOX STREET in CASTLE ROCK?
Encore - Commerce Bank Tenant Improvement is a site development plan project in CASTLE ROCK, Colorado, currently shown as RECENT SUBMITTAL. ConstructionCurrent connects 1 public timeline signal and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.
Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.
Project intelligence
A proposed tenant interior improvement and exterior modifications of an existing 2,156 square foot tenant space for Commerce Bank. The proposed modifications would include making space for an ATM by relocating an exterior door 36 inches to the west t
- Class
- SITE DEVELOPMENT PLAN
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250511219002
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Encore - Commerce Bank Tenant Improvement
A proposed tenant interior improvement and exterior modifications of an existing 2,156 square foot tenant space for Commerce Bank. The proposed modifications would include making space for an ATM by relocating an exterior door 36 inches to the west t
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.
Doors / Hardware
The public record directly references doors / hardware work. Project signal (development project): The public record directly references doors / hardware work.
See Doors / Hardware activity in CASTLE ROCK →Excavation / Grading
Site-development work commonly requires grading and earthwork.
See Excavation / Grading activity in CASTLE ROCK →General Contractor
Tenant improvement/remodel work commonly requires overall trade coordination. Site-development work often requires prime/overall construction coordination. Project signal (development project): Tenant improvement/remodel work commonly requires overall trade coordination.
See General Contractor activity in CASTLE ROCK →Site Utilities
Site-development work commonly requires underground utilities.
See Site Utilities activity in CASTLE ROCK →Electrical
Tenant improvement/remodel projects commonly involve electrical modifications. Project signal (development project): Tenant improvement/remodel projects commonly involve electrical modifications.
See Electrical activity in CASTLE ROCK →Concrete
Site-development work commonly includes concrete flatwork/curbs.
See Concrete activity in CASTLE ROCK →HVAC / Mechanical
Tenant improvement/remodel projects commonly involve HVAC or mechanical modifications. Project signal (development project): Tenant improvement/remodel projects commonly involve HVAC or mechanical modifications.
See HVAC / Mechanical activity in CASTLE ROCK →Landscaping
Site plans commonly include landscape installation/restoration.
See Landscaping activity in CASTLE ROCK →Paving / Asphalt
Site-development work commonly includes drives, roads, or parking areas.
See Paving / Asphalt activity in CASTLE ROCK →Plumbing
Tenant improvement/remodel projects often involve plumbing modifications. Project signal (development project): Tenant improvement/remodel projects often involve plumbing modifications.
See Plumbing activity in CASTLE ROCK →Drywall
Interior build-outs commonly include partitions and drywall. Project signal (development project): Interior build-outs commonly include partitions and drywall.
See Drywall activity in CASTLE ROCK →Painting / Coatings
Interior build-outs commonly include painting and finish work. Project signal (development project): Interior build-outs commonly include painting and finish work.
See Painting / Coatings activity in CASTLE ROCK →