422 Front Street Local Landmark
422 FRONT STREET, CASTLE ROCK 80104
Project intelligence
The property owner is proposing to locally landmark the residence at 422 Front Street. The 1.5 story building was constructed in 1902 with a rhyolite veneer and hipped roof with flared overhanging eaves. The roof is clad in asphalt shingles . A ce
- Class
- HISTORIC PRESERVATION
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250511119001
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
422 Front Street Local Landmark
The property owner is proposing to locally landmark the residence at 422 Front Street. The 1.5 story building was constructed in 1902 with a rhyolite veneer and hipped roof with flared overhanging eaves. The roof is clad in asphalt shingles . A ce
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Paving / Asphalt
The public record directly references paving / asphalt work. Roadway work commonly includes paving/asphalt scopes. Project signal (development project): The public record directly references paving / asphalt work. Roadway work commonly includes paving/asphalt scopes.
See Paving / Asphalt activity →Roofing
The public record directly references roofing work. Linked permit 16-1480: The public record directly references roofing work. Project signal (development project): The public record directly references roofing work. Project signal (permit): The public record directly references roofing work.
See Roofing activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.
See Concrete activity →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Site Utilities
Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.
See Structural Steel activity →Landscaping
Transportation projects often include landscape restoration. Project signal (development project): Transportation projects often include landscape restoration.
See Landscaping activity →