CONNECTED PROJECT · SDP26-0023

The Meadows Castle Rock Restaurant amd 1

3673 BILLBER, CASTLE ROCK 80109

PROJECTSPENDING RESUBMITTAL1 source
PROJECT ANSWER

What is happening at 3673 BILLBER in CASTLE ROCK?

The Meadows Castle Rock Restaurant amd 1 is a site development plan project in CASTLE ROCK, Colorado, currently shown as PROJECTS. ConstructionCurrent connects 1 public timeline signal and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.

Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.

Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

The proposed revisions include updates to the architecture and other minor site modifications. The project site is located southwest of the intersection of Future Street and Meadows Boulevard.

Class
SITE DEVELOPMENT PLAN
Reported valuation
—
Square feet
—
Parcel SPN
235133137006
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2026-08-05
development projectSource fact

The Meadows Castle Rock Restaurant amd 1

The proposed revisions include updates to the architecture and other minor site modifications. The project site is located southwest of the intersection of Future Street and Meadows Boulevard.

PENDING RESUBMITTALCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.

Browse all trades →
Likely90%

General Contractor

Restaurant build-outs typically require coordinated multi-trade construction. Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Restaurant build-outs typically require coordinated multi-trade construction. Public roadway/transportation work typically requires prime construction coordination.

See General Contractor activity in CASTLE ROCK →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.

See Paving / Asphalt activity in CASTLE ROCK →
Likely90%

Plumbing

Restaurant projects commonly require substantial plumbing/fixture work. Project signal (development project): Restaurant projects commonly require substantial plumbing/fixture work.

See Plumbing activity in CASTLE ROCK →
Likely88%

Commercial Kitchen Equipment

Restaurant build-outs commonly require commercial kitchen and food-service equipment. Project signal (development project): Restaurant build-outs commonly require commercial kitchen and food-service equipment.

See Commercial Kitchen Equipment activity in CASTLE ROCK →
Likely88%

Excavation / Grading

Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.

See Excavation / Grading activity in CASTLE ROCK →
Likely86%

Concrete

Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.

See Concrete activity in CASTLE ROCK →
Likely86%

Electrical

Restaurant projects commonly require substantial electrical work. Project signal (development project): Restaurant projects commonly require substantial electrical work.

See Electrical activity in CASTLE ROCK →
Likely86%

HVAC / Mechanical

Restaurant projects commonly require HVAC and kitchen ventilation. Project signal (development project): Restaurant projects commonly require HVAC and kitchen ventilation.

See HVAC / Mechanical activity in CASTLE ROCK →
Likely85%

Site Utilities

Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity in CASTLE ROCK →
Likely82%

Fire Protection

Restaurant projects commonly require fire/life-safety and suppression work. Project signal (development project): Restaurant projects commonly require fire/life-safety and suppression work.

See Fire Protection activity in CASTLE ROCK →
Likely76%

Landscaping

Site plans commonly include landscape installation/restoration. Transportation projects often include landscape restoration. Project signal (development project): Transportation projects often include landscape restoration.

See Landscaping activity in CASTLE ROCK →
Likely70%

Drywall

Restaurant build-outs commonly include partitions and interior finishes. Project signal (development project): Restaurant build-outs commonly include partitions and interior finishes.

See Drywall activity in CASTLE ROCK →