Founders Village Turf Reduction Phase 3
, CASTLE ROCK 80104
Project intelligence
Removing the existing sod from the median located within Enderud Boulevard, directly north of the Lantern Trail intersection. The objective of this project is to create a beautiful and conservation-focused streetscape with decreased irrigation water
- Class
- CONSTRUCTION DRAWINGS
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250708399003
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Founders Village Turf Reduction Phase 3
Removing the existing sod from the median located within Enderud Boulevard, directly north of the Lantern Trail intersection. The objective of this project is to create a beautiful and conservation-focused streetscape with decreased irrigation water
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Irrigation
The public record directly references irrigation work. Parks/fields commonly require irrigation systems. Project signal (development project): The public record directly references irrigation work. Parks/fields commonly require irrigation systems.
See Irrigation activity →Landscaping
The public record directly references landscaping work. Transportation projects often include landscape restoration. Park/open-space projects commonly require significant landscape work. Project signal (development project): The public record directly references landscaping work. Transportation projects often include landscape restoration. Park/open-space projects commonly require significant landscape work.
See Landscaping activity →Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements. Project signal (development project): Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements.
See Paving / Asphalt activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Site Utilities
Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →Fencing
Park/athletic projects often include fencing or gates. Project signal (development project): Park/athletic projects often include fencing or gates.
See Fencing activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.
See Structural Steel activity →Electrical
Park projects may include lighting or site electrical work. Project signal (development project): Park projects may include lighting or site electrical work.
See Electrical activity →