CONNECTED PROJECT · SDP26-0011

Rivers Church Facade Change

136 S WILCOX ST, CASTLE ROCK 80104

PROJECTSUNDER REVIEW2 sources
Project:OverviewTimelineTradesPermits
AT A GLANCE

Project intelligence

The property owner is proposing to renovate the west facade of the units at 136 and 138 South Wilcox Street. The site plan amendment includes building elevations depicting an increased height of the entry parapet, new paint colors, updated facade ma

Class
OTHER PROJECTS
Reported valuation
—
Square feet
—
Parcel SPN
250511306018
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2017-10-09
permitSource fact

SIGNS PERMANENT · W17-2320

CROSSFIT LOOP

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2026-08-21
permitSource fact

COMMERCIAL DEMOLITION · 26-2940

RIVERS CHURCH DEMO

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2026-10-01
development projectSource fact

Rivers Church Facade Change

The property owner is proposing to renovate the west facade of the units at 136 and 138 South Wilcox Street. The site plan amendment includes building elevations depicting an increased height of the entry parapet, new paint colors, updated facade ma

UNDER REVIEWCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Source-backed98%

Demolition

Linked permit 26-2940: The public record directly references demolition work. Project signal (permit): The public record directly references demolition work.

See Demolition activity →
Source-backed98%

Painting / Coatings

The public record directly references painting / coatings work. Project signal (development project): The public record directly references painting / coatings work.

See Painting / Coatings activity →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.

See Paving / Asphalt activity →
Likely88%

Excavation / Grading

Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading. Project signal (development project): Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading.

See Excavation / Grading activity →
Likely86%

Concrete

Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.

See Concrete activity →
Likely85%

Site Utilities

Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity →
Likely82%

General Contractor

Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.

See General Contractor activity →
Likely76%

Landscaping

Site plans commonly include landscape installation/restoration. Transportation projects often include landscape restoration. Project signal (development project): Site plans commonly include landscape installation/restoration. Transportation projects often include landscape restoration.

See Landscaping activity →
Likely62%

Irrigation

Landscape/site-development work may require irrigation systems. Project signal (development project): Landscape/site-development work may require irrigation systems.

See Irrigation activity →
Likely58%

Structural Steel

Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.

See Structural Steel activity →
RELATED PERMITS

2 permit records connected to this project