CONNECTED PROJECT · CD25-0022

T-Mobile Small Cell Mikelson and Millbridge

6198 BRANTLY CT, CASTLE ROCK 80104

PROJECTSUNDER REVIEW1 source
Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

961 MIKELSON BOULEVARD

Class
CONSTRUCTION DRAWINGS
Reported valuation
—
Square feet
—
Parcel SPN
250717199002
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2026-09-24
development projectSource fact

T-Mobile Small Cell Mikelson and Millbridge

961 MIKELSON BOULEVARD

UNDER REVIEWCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.

See Paving / Asphalt activity →
Likely86%

Concrete

Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.

See Concrete activity →
Likely84%

Excavation / Grading

Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.

See Excavation / Grading activity →
Likely82%

General Contractor

Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.

See General Contractor activity →
Likely65%

Site Utilities

Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity →
Likely58%

Structural Steel

Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.

See Structural Steel activity →
Likely45%

Landscaping

Transportation projects often include landscape restoration. Project signal (development project): Transportation projects often include landscape restoration.

See Landscaping activity →
Search visibility: this project remains available to site users but is withheld from search-engine indexing until enough distinct source-backed detail is connected.