CONNECTED PROJECT · CD22-0046

Perry Street Social District

404 N PERRY STREET, CASTLE ROCK 80104

PROJECTSPENDING RESUBMITTAL2 sources
PROJECT ANSWER

What is happening at 404 N PERRY STREET in CASTLE ROCK?

Perry Street Social District is a construction drawings project in CASTLE ROCK, Colorado, currently shown as PROJECTS. ConstructionCurrent connects 4 public timeline signals and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.

Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.

Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

Perry Street Collective, LLC submitted a CD land use application for the improvements associated with Perry Street Social District, which is an entertainment district theme that includes food, beer garden, games and music/events venue. The project i

Class
CONSTRUCTION DRAWINGS
Reported valuation
—
Square feet
—
Parcel SPN
250511120007
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2016-09-08
permitSource fact

COMMERCIAL ROOF · W16-3297

COMMERICAL RE ROOF

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2017-10-27
permitSource fact

COM ELECTRICAL · 17-1844

ELECTRICAL METER RELEASE TO ICE RINK

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2022-11-16
development projectSource fact

Perry Street Social District

Perry Street Collective, LLC submitted a CD land use application for the improvements associated with Perry Street Social District, which is an entertainment district theme that includes food, beer garden, games and music/events venue. The project i

PENDING RESUBMITTALCastle Rock Development Activity Map
Open authoritative source →
2023-02-17
permitSource fact

COMMERCIAL NEW · 22-1069

FIDELI'S PERRY STREET SOCIAL COMMERCIAL REMODEL

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.

Browse all trades →
Source-backed98%

Electrical

Project signal (permit): The public record directly references electrical work. Project signal (permit): Tenant improvement/remodel projects commonly involve electrical modifications. Remodels often require electrical modifications.

See Electrical activity in CASTLE ROCK →
Source-backed98%

Roofing

Project signal (permit): The public record directly references roofing work.

See Roofing activity in CASTLE ROCK →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes. Project signal (permit): Roadway work commonly includes paving/asphalt scopes.

See Paving / Asphalt activity in CASTLE ROCK →
Likely88%

General Contractor

Project signal (permit): Tenant improvement/remodel work commonly requires overall trade coordination. Public roadway/transportation work typically requires prime construction coordination. Remodel/alteration work commonly requires coordinated construction management.

See General Contractor activity in CASTLE ROCK →
Likely86%

Concrete

Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (permit): Roadway/bridge work commonly includes concrete structures or flatwork.

See Concrete activity in CASTLE ROCK →
Likely84%

Excavation / Grading

Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading. Project signal (permit): Roadway work commonly requires excavation and grading.

See Excavation / Grading activity in CASTLE ROCK →
Likely77%

HVAC / Mechanical

Project signal (permit): Tenant improvement/remodel projects commonly involve HVAC or mechanical modifications. Remodels often require HVAC/mechanical modifications.

See HVAC / Mechanical activity in CASTLE ROCK →
Likely74%

Plumbing

Project signal (permit): Tenant improvement/remodel projects often involve plumbing modifications. Remodels can require plumbing modifications.

See Plumbing activity in CASTLE ROCK →
Likely73%

Drywall

Project signal (permit): Interior build-outs commonly include partitions and drywall. Remodels commonly include partitions/drywall.

See Drywall activity in CASTLE ROCK →
Likely68%

Painting / Coatings

Project signal (permit): Interior build-outs commonly include painting and finish work. Remodels commonly include finish work.

See Painting / Coatings activity in CASTLE ROCK →
Likely65%

Flooring / Tile

Project signal (permit): Interior build-outs commonly include flooring or tile work.

See Flooring / Tile activity in CASTLE ROCK →
Likely65%

Site Utilities

Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure. Project signal (permit): Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity in CASTLE ROCK →