Downtown Circle K Redevelopment
310 S WILCOX ST, CASTLE ROCK 80104
What is happening at 310 S WILCOX ST in CASTLE ROCK?
Downtown Circle K Redevelopment is a site development plan project in CASTLE ROCK, Colorado, currently shown as PROJECTS. ConstructionCurrent connects 9 public timeline signals and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.
Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.
Project intelligence
A new 3,700 sq. ft. convenience store building to replace the existing 1,838 sq. ft. building. No changes are proposed for the existing fueling station, which is to remain open during construction of the new convenience store building.
- Class
- SITE DEVELOPMENT PLAN
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250511306014
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Downtown Circle K Redevelopment
A new 3,700 sq. ft. convenience store building to replace the existing 1,838 sq. ft. building. No changes are proposed for the existing fueling station, which is to remain open during construction of the new convenience store building.
Open authoritative source →TEMPORARY USE PERMIT · 23-1657
CIRCLE K TEMPORARY KIOSK EXPIRES 11/1/2025
Open authoritative source →COMMERCIAL ROOF · 25-3568
CIRCLE K CAR WASH COMMERCIAL ROOF
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.
Demolition
Project signal (permit): The public record directly references demolition work.
See Demolition activity in CASTLE ROCK →Electrical
Project signal (permit): The public record directly references electrical work.
See Electrical activity in CASTLE ROCK →Roofing
Project signal (permit): The public record directly references roofing work.
See Roofing activity in CASTLE ROCK →Excavation / Grading
Site-development work commonly requires grading and earthwork.
See Excavation / Grading activity in CASTLE ROCK →Site Utilities
Site-development work commonly requires underground utilities.
See Site Utilities activity in CASTLE ROCK →Concrete
Site-development work commonly includes concrete flatwork/curbs.
See Concrete activity in CASTLE ROCK →Landscaping
Site plans commonly include landscape installation/restoration.
See Landscaping activity in CASTLE ROCK →Paving / Asphalt
Site-development work commonly includes drives, roads, or parking areas.
See Paving / Asphalt activity in CASTLE ROCK →General Contractor
Site-development work often requires prime/overall construction coordination.
See General Contractor activity in CASTLE ROCK →Irrigation
Landscape/site-development work may require irrigation systems.
See Irrigation activity in CASTLE ROCK →