CONNECTED PROJECT · SDP20-0033

Terrain North Basin Single Family Residential

2819 CASTLE OAKS DRIVE, CASTLE ROCK 80108

PROJECTSPENDING RESUBMITTAL1 source
Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

Site Development Plan for Phase 2 of Terrain North Basin (PA 8) is for the 29 single-family detached lots, associated roadways and infrastructure and 35.66 acres of open space on approximately 42 acres. The site is currently an undeveloped parcel of

Class
SITE DEVELOPMENT PLAN
Reported valuation
—
Square feet
—
Parcel SPN
234930401002
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2025-02-25
development projectSource fact

Terrain North Basin Single Family Residential

Site Development Plan for Phase 2 of Terrain North Basin (PA 8) is for the 29 single-family detached lots, associated roadways and infrastructure and 35.66 acres of open space on approximately 42 acres. The site is currently an undeveloped parcel of

PENDING RESUBMITTALCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Likely92%

General Contractor

New residential construction typically requires overall trade coordination. Site-development work often requires prime/overall construction coordination. Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): New residential construction typically requires overall trade coordination. Site-development work often requires prime/overall construction coordination. Public roadway/transportation work typically requires prime construction coordination.

See General Contractor activity →
Likely92%

Landscaping

Park/open-space projects commonly require significant landscape work. Project signal (development project): Park/open-space projects commonly require significant landscape work.

See Landscaping activity →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements. Project signal (development project): Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements.

See Paving / Asphalt activity →
Likely88%

Excavation / Grading

Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading. Project signal (development project): Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading.

See Excavation / Grading activity →
Likely86%

Concrete

Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.

See Concrete activity →
Likely85%

Site Utilities

Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity →
Likely82%

Carpentry / Framing

New homes commonly require framing/carpentry. Project signal (development project): New homes commonly require framing/carpentry.

See Carpentry / Framing activity →
Likely82%

Irrigation

Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.

See Irrigation activity →
Likely76%

Electrical

New homes require electrical systems. Park projects may include lighting or site electrical work. Project signal (development project): New homes require electrical systems. Park projects may include lighting or site electrical work.

See Electrical activity →
Likely76%

Plumbing

New homes require plumbing systems. Project signal (development project): New homes require plumbing systems.

See Plumbing activity →
Likely74%

HVAC / Mechanical

New homes require HVAC/mechanical systems. Project signal (development project): New homes require HVAC/mechanical systems.

See HVAC / Mechanical activity →
Likely72%

Roofing

New homes require roofing. Project signal (development project): New homes require roofing.

See Roofing activity →