South Ridge Road Annexation No. 2 PL-1 Zoning
, Castle Rock
Project intelligence
The Town of Castle Rock is proposing to annex one parcel of land that is owned by the Town, but is not within the Town boundaries. The .022 acre parcel is located on the east side of Ridge Road, south of the Enderud/Ridge Road roundabout. The Town p
- Class
- STRAIGHT ZONE
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250707499034
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
South Ridge Road Annexation No. 2 PL-1 Zoning
The Town of Castle Rock is proposing to annex one parcel of land that is owned by the Town, but is not within the Town boundaries. The .022 acre parcel is located on the east side of Ridge Road, south of the Enderud/Ridge Road roundabout. The Town p
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.
See Paving / Asphalt activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.
See Concrete activity →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Site Utilities
Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.
See Structural Steel activity →Landscaping
Transportation projects often include landscape restoration. Project signal (development project): Transportation projects often include landscape restoration.
See Landscaping activity →