CONNECTED PROJECT · SDP26-0004

Key Bank, Dawson Trails

, CASTLE ROCK 80109

PROJECTSWITHDRAWN1 source
Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

This Site Development Plan is for a 3,035 square foot financial institution to be located at the southwest corner of Dawson Trail Boulevard and Gambel Ridge Boulevard. There are 3 drive-through bank lanes proposed. The property is located in Council

Class
SITE DEVELOPMENT PLAN
Reported valuation
—
Square feet
—
Parcel SPN
250522305006
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2026-04-27
development projectSource fact

Key Bank, Dawson Trails

This Site Development Plan is for a 3,035 square foot financial institution to be located at the southwest corner of Dawson Trail Boulevard and Gambel Ridge Boulevard. There are 3 drive-through bank lanes proposed. The property is located in Council

WITHDRAWNCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Likely92%

Landscaping

Park/open-space projects commonly require significant landscape work. Project signal (development project): Park/open-space projects commonly require significant landscape work.

See Landscaping activity →
Likely88%

Excavation / Grading

Site-development work commonly requires grading and earthwork. Project signal (development project): Site-development work commonly requires grading and earthwork.

See Excavation / Grading activity →
Likely85%

Site Utilities

Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.

See Site Utilities activity →
Likely82%

Irrigation

Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.

See Irrigation activity →
Likely78%

Concrete

Site-development work commonly includes concrete flatwork/curbs. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Site-development work commonly includes concrete flatwork/curbs. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.

See Concrete activity →
Likely76%

Paving / Asphalt

Site-development work commonly includes drives, roads, or parking areas. Park/trail projects may include paved trails or parking improvements. Project signal (development project): Site-development work commonly includes drives, roads, or parking areas. Park/trail projects may include paved trails or parking improvements.

See Paving / Asphalt activity →
Likely70%

General Contractor

Site-development work often requires prime/overall construction coordination. Project signal (development project): Site-development work often requires prime/overall construction coordination.

See General Contractor activity →
Likely58%

Fencing

Park/athletic projects often include fencing or gates. Project signal (development project): Park/athletic projects often include fencing or gates.

See Fencing activity →
Likely48%

Electrical

Park projects may include lighting or site electrical work. Project signal (development project): Park projects may include lighting or site electrical work.

See Electrical activity →
Search visibility: this project remains available to site users but is withheld from search-engine indexing until enough distinct source-backed detail is connected.