Meadows 17 Little Sunshine's Playhouse Amendment
3773 LIMELIGHT AVE, CASTLE ROCK 80109
Project intelligence
Site Development Plan Amendment for exterior site lighting revisions to meet required building plan requirements, specifically ensuring a minimum of 1 footcandle along all egress paths from the building to the right-of-way.
- Class
- SITE DEVELOPMENT PLAN
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 235134203041
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
COM ELECTRICAL · 24-4268
TEMP POWER FOR CONSTRUCTION TRAILER
Open authoritative source →Meadows 17 Little Sunshine's Playhouse Amendment
Site Development Plan Amendment for exterior site lighting revisions to meet required building plan requirements, specifically ensuring a minimum of 1 footcandle along all egress paths from the building to the right-of-way.
Open authoritative source →COMMERCIAL NEW · 24-1136
LITTLE SUNSHINE'S PLAYHOUSE DAYCARE
Open authoritative source →COMMERCIAL MISC · 25-0650
LITTLE SUNSHINE'S SHADE STRUCTURE IN PLAYGROUND
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Electrical
The public record directly references electrical work. Linked permit 24-3800: Park projects may include lighting or site electrical work. Linked permit 24-4268: The public record directly references electrical work. Park projects may include lighting or site electrical work. Linked permit 25-0650: Park projects may include lighting or site electrical work. Project signal (development project): The public record directly references electrical work. Project signal (permit): Park projects may include lighting or site electrical work. Project signal (permit): The public record directly references electrical work. Park projects may include lighting or site electrical work.
See Electrical activity →Landscaping
Linked permit 24-3800: Park/open-space projects commonly require significant landscape work. Linked permit 24-4268: Park/open-space projects commonly require significant landscape work. Linked permit 25-0650: Park/open-space projects commonly require significant landscape work. Project signal (development project): Site plans commonly include landscape installation/restoration. Project signal (permit): Park/open-space projects commonly require significant landscape work.
See Landscaping activity →Excavation / Grading
Site-development work commonly requires grading and earthwork. Project signal (development project): Site-development work commonly requires grading and earthwork.
See Excavation / Grading activity →Site Utilities
Site-development work commonly requires underground utilities. Project signal (development project): Site-development work commonly requires underground utilities.
See Site Utilities activity →Irrigation
Linked permit 24-3800: Parks/fields commonly require irrigation systems. Linked permit 24-4268: Parks/fields commonly require irrigation systems. Linked permit 25-0650: Parks/fields commonly require irrigation systems. Project signal (development project): Landscape/site-development work may require irrigation systems. Project signal (permit): Parks/fields commonly require irrigation systems.
See Irrigation activity →Concrete
Site-development work commonly includes concrete flatwork/curbs. Linked permit 24-3800: Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Linked permit 24-4268: Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Linked permit 25-0650: Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Site-development work commonly includes concrete flatwork/curbs. Project signal (permit): Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity →Paving / Asphalt
Site-development work commonly includes drives, roads, or parking areas. Linked permit 24-3800: Park/trail projects may include paved trails or parking improvements. Linked permit 24-4268: Park/trail projects may include paved trails or parking improvements. Linked permit 25-0650: Park/trail projects may include paved trails or parking improvements. Project signal (development project): Site-development work commonly includes drives, roads, or parking areas. Project signal (permit): Park/trail projects may include paved trails or parking improvements.
See Paving / Asphalt activity →General Contractor
Site-development work often requires prime/overall construction coordination. Project signal (development project): Site-development work often requires prime/overall construction coordination.
See General Contractor activity →Fencing
Linked permit 24-3800: Park/athletic projects often include fencing or gates. Linked permit 24-4268: Park/athletic projects often include fencing or gates. Linked permit 25-0650: Park/athletic projects often include fencing or gates. Project signal (permit): Park/athletic projects often include fencing or gates.
See Fencing activity →6 permit records connected to this project
CONSTRUCTION TRAILER
24-3800
COM ELECTRICALTEMP POWER FOR CONSTRUCTION TRAILER
24-4268
COMMERCIAL NEWLITTLE SUNSHINE'S PLAYHOUSE DAYCARE
24-1136
COM RETAINING WALLSEGEMENTAL RETAINING WALL
24-4569
SIGNS PERMANENTLITTLE SUNSHINE PLAYHOUSE
25-0647
COMMERCIAL MISCLITTLE SUNSHINE'S SHADE STRUCTURE IN PLAYGROUND
25-0650