Walmart Fuel Station and Convenience Store
133 SAM WALTON LANE, CASTLE ROCK 80104
Project intelligence
The applicant is proposing a fueling station with 12 fuel dispensers and a 1,621 square foot convenience store. The fueling station and convenience store are to be located in the southwest corner of the existing Walmart parking lot.
- Class
- SITE DEVELOPMENT PLAN
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 235126303003
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Walmart Fuel Station and Convenience Store
The applicant is proposing a fueling station with 12 fuel dispensers and a 1,621 square foot convenience store. The fueling station and convenience store are to be located in the southwest corner of the existing Walmart parking lot.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Paving / Asphalt
The public record directly references paving / asphalt work. Site-development work commonly includes drives, roads, or parking areas. Park/trail projects may include paved trails or parking improvements. Project signal (development project): The public record directly references paving / asphalt work. Park/trail projects may include paved trails or parking improvements.
See Paving / Asphalt activity →Landscaping
Park/open-space projects commonly require significant landscape work. Project signal (development project): Park/open-space projects commonly require significant landscape work.
See Landscaping activity →Excavation / Grading
Site-development work commonly requires grading and earthwork.
See Excavation / Grading activity →Site Utilities
Site-development work commonly requires underground utilities.
See Site Utilities activity →Irrigation
Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.
See Irrigation activity →Concrete
Site-development work commonly includes concrete flatwork/curbs. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity →General Contractor
Site-development work often requires prime/overall construction coordination.
See General Contractor activity →Fencing
Park/athletic projects often include fencing or gates. Project signal (development project): Park/athletic projects often include fencing or gates.
See Fencing activity →Electrical
Park projects may include lighting or site electrical work. Project signal (development project): Park projects may include lighting or site electrical work.
See Electrical activity →