CONNECTED PROJECT · SDP24-0003

WITHDRAWN Kohl's EV Charging Stations

4800 MILESTONE LANE, CASTLE ROCK 80104

PROJECTSWITHDRAWN2 sources
Project:OverviewTimelineTradesPermits
AT A GLANCE

Project intelligence

Install (4) electric vehicle charging stations and associated equipment in the Kohls Department Store parking lot. Charging stations, equipment and a new utility transformer will be in an existing landscape island. Two small trees will need to be rem

Class
SITE DEVELOPMENT PLAN
Reported valuation
—
Square feet
—
Parcel SPN
235126303017
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2019-02-07
permitSource fact

COMMERCIAL ROOF · 19-0233

COMMERCIAL RE ROOF

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2022-04-15
permitSource fact

COMMERCIAL AC · 22-1268

KOHLS REPLACING 9 RTU'S

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2024-11-14
development projectSource fact

WITHDRAWN Kohl's EV Charging Stations

Install (4) electric vehicle charging stations and associated equipment in the Kohls Department Store parking lot. Charging stations, equipment and a new utility transformer will be in an existing landscape island. Two small trees will need to be rem

WITHDRAWNCastle Rock Development Activity Map
Open authoritative source →
2025-01-24
permitSource fact

COM ELECTRICAL · 25-0014

FLOOR POWER EXTENSION

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Source-backed98%

Electrical

The public record directly references electrical work. Park projects may include lighting or site electrical work. Linked permit 25-0014: The public record directly references electrical work. Project signal (development project): The public record directly references electrical work. Park projects may include lighting or site electrical work. Project signal (permit): The public record directly references electrical work.

See Electrical activity →
Source-backed98%

Landscaping

The public record directly references landscaping work. Site plans commonly include landscape installation/restoration. Park/open-space projects commonly require significant landscape work. Project signal (development project): The public record directly references landscaping work. Park/open-space projects commonly require significant landscape work.

See Landscaping activity →
Source-backed98%

Paving / Asphalt

The public record directly references paving / asphalt work. Site-development work commonly includes drives, roads, or parking areas. Park/trail projects may include paved trails or parking improvements. Project signal (development project): The public record directly references paving / asphalt work. Park/trail projects may include paved trails or parking improvements.

See Paving / Asphalt activity →
Source-backed98%

Roofing

Linked permit 19-0233: The public record directly references roofing work. Project signal (permit): The public record directly references roofing work.

See Roofing activity →
Likely88%

Excavation / Grading

Site-development work commonly requires grading and earthwork.

See Excavation / Grading activity →
Likely85%

Site Utilities

Site-development work commonly requires underground utilities.

See Site Utilities activity →
Likely82%

Irrigation

Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.

See Irrigation activity →
Likely78%

Concrete

Site-development work commonly includes concrete flatwork/curbs. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Park projects often include sidewalks, pads, curbs, or other concrete flatwork.

See Concrete activity →
Likely70%

General Contractor

Site-development work often requires prime/overall construction coordination.

See General Contractor activity →
Likely58%

Fencing

Park/athletic projects often include fencing or gates. Project signal (development project): Park/athletic projects often include fencing or gates.

See Fencing activity →
RELATED PERMITS

3 permit records connected to this project