WITHDRAWN Kohl's EV Charging Stations
4800 MILESTONE LANE, CASTLE ROCK 80104
Project intelligence
Install (4) electric vehicle charging stations and associated equipment in the Kohls Department Store parking lot. Charging stations, equipment and a new utility transformer will be in an existing landscape island. Two small trees will need to be rem
- Class
- SITE DEVELOPMENT PLAN
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 235126303017
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
WITHDRAWN Kohl's EV Charging Stations
Install (4) electric vehicle charging stations and associated equipment in the Kohls Department Store parking lot. Charging stations, equipment and a new utility transformer will be in an existing landscape island. Two small trees will need to be rem
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Electrical
The public record directly references electrical work. Park projects may include lighting or site electrical work. Linked permit 25-0014: The public record directly references electrical work. Project signal (development project): The public record directly references electrical work. Park projects may include lighting or site electrical work. Project signal (permit): The public record directly references electrical work.
See Electrical activity →Landscaping
The public record directly references landscaping work. Site plans commonly include landscape installation/restoration. Park/open-space projects commonly require significant landscape work. Project signal (development project): The public record directly references landscaping work. Park/open-space projects commonly require significant landscape work.
See Landscaping activity →Paving / Asphalt
The public record directly references paving / asphalt work. Site-development work commonly includes drives, roads, or parking areas. Park/trail projects may include paved trails or parking improvements. Project signal (development project): The public record directly references paving / asphalt work. Park/trail projects may include paved trails or parking improvements.
See Paving / Asphalt activity →Roofing
Linked permit 19-0233: The public record directly references roofing work. Project signal (permit): The public record directly references roofing work.
See Roofing activity →Excavation / Grading
Site-development work commonly requires grading and earthwork.
See Excavation / Grading activity →Site Utilities
Site-development work commonly requires underground utilities.
See Site Utilities activity →Irrigation
Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.
See Irrigation activity →Concrete
Site-development work commonly includes concrete flatwork/curbs. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity →General Contractor
Site-development work often requires prime/overall construction coordination.
See General Contractor activity →Fencing
Park/athletic projects often include fencing or gates. Project signal (development project): Park/athletic projects often include fencing or gates.
See Fencing activity →