CONNECTED PROJECT · PL25-0005

Dawson Trails Residential, Infrastructure - Filing 2 Am 3

, CASTLE ROCK 80109

APPROVED/CLOSEDAPPROVED1 source
Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

Subdivision plat of approximately 9 acres to create rights-of-way, etc., to enhance connectivity within Dawson Trails, Filing 2. The two proposed streets would be accessible from the future Dawson Trails Boulevard, Quandary Peak Drive, and Blanca Pe

Class
PLAT
Reported valuation
—
Square feet
—
Parcel SPN
250522000055
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2026-07-13
development projectSource fact

Dawson Trails Residential, Infrastructure - Filing 2 Am 3

Subdivision plat of approximately 9 acres to create rights-of-way, etc., to enhance connectivity within Dawson Trails, Filing 2. The two proposed streets would be accessible from the future Dawson Trails Boulevard, Quandary Peak Drive, and Blanca Pe

APPROVEDCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Likely92%

Landscaping

Park/open-space projects commonly require significant landscape work. Project signal (development project): Park/open-space projects commonly require significant landscape work.

See Landscaping activity →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements. Project signal (development project): Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements.

See Paving / Asphalt activity →
Likely88%

Excavation / Grading

Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading. Project signal (development project): Site-development work commonly requires grading and earthwork. Roadway work commonly requires excavation and grading.

See Excavation / Grading activity →
Likely86%

Concrete

Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.

See Concrete activity →
Likely85%

Site Utilities

Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Site-development work commonly requires underground utilities. Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity →
Likely82%

General Contractor

Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.

See General Contractor activity →
Likely82%

Irrigation

Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.

See Irrigation activity →
Likely58%

Fencing

Park/athletic projects often include fencing or gates. Project signal (development project): Park/athletic projects often include fencing or gates.

See Fencing activity →
Likely58%

Structural Steel

Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.

See Structural Steel activity →
Likely48%

Electrical

Park projects may include lighting or site electrical work. Project signal (development project): Park projects may include lighting or site electrical work.

See Electrical activity →
Search visibility: this project remains available to site users but is withheld from search-engine indexing until enough distinct source-backed detail is connected.