CONNECTED PROJECT · HIS25-0001

110 N Lewis St, Outdoor Kitchen

110 N LEWIS ST, CASTLE ROCK 80104

APPROVED/CLOSEDAPPROVED2 sources
Project:OverviewTimelineTradesPermits
AT A GLANCE

Project intelligence

A Landmark Alteration Certificate to add a covered outdoor kitchen that attaches to the rear of the locally landmarked 110 Lewis Street, also known as the Jacob Kroll House.

Class
HISTORIC PRESERVATION
Reported valuation
—
Square feet
—
Parcel SPN
250511138004
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2018-10-16
permitSource fact

GAS OR SEWER LINE REPAIR · 18-3769

SEWER REPAIR

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2020-02-28
permitSource fact

RESIDENTIAL CUSTOM · 19-2852

ADU STRUCTURE AT REAR OF PROPERTY

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2024-03-20
permitSource fact

RESIDENTIAL ROOF · 24-0976

REROOF

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2025-05-15
permitSource fact

RESIDENTIAL ADDITION · 25-0793

MASTER BEDROOM BATH ADDITION

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
2025-06-12
development projectSource fact

110 N Lewis St, Outdoor Kitchen

A Landmark Alteration Certificate to add a covered outdoor kitchen that attaches to the rear of the locally landmarked 110 Lewis Street, also known as the Jacob Kroll House.

APPROVEDCastle Rock Development Activity Map
Open authoritative source →
2025-09-30
permitSource fact

DECK WITH COVER · 25-2395

COVERED DECK W/ KITCHEN

ISSUEDCastle Rock Building Permits Issued Database
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Source-backed98%

Carpentry / Framing

Linked permit 25-2395: The public record directly references carpentry / framing work. Project signal (permit): The public record directly references carpentry / framing work.

See Carpentry / Framing activity →
Source-backed98%

Roofing

Linked permit 24-0976: The public record directly references roofing work. Project signal (permit): The public record directly references roofing work.

See Roofing activity →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.

See Paving / Asphalt activity →
Likely86%

Concrete

Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.

See Concrete activity →
Likely84%

Excavation / Grading

Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.

See Excavation / Grading activity →
Likely82%

General Contractor

Public roadway/transportation work typically requires prime construction coordination. Remodel/alteration work commonly requires coordinated construction management. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination. Remodel/alteration work commonly requires coordinated construction management.

See General Contractor activity →
Likely70%

Electrical

Remodels often require electrical modifications. Project signal (development project): Remodels often require electrical modifications.

See Electrical activity →
Likely66%

Drywall

Remodels commonly include partitions/drywall. Project signal (development project): Remodels commonly include partitions/drywall.

See Drywall activity →
Likely66%

HVAC / Mechanical

Remodels often require HVAC/mechanical modifications. Project signal (development project): Remodels often require HVAC/mechanical modifications.

See HVAC / Mechanical activity →
Likely65%

Site Utilities

Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity →
Likely64%

Plumbing

Remodels can require plumbing modifications. Project signal (development project): Remodels can require plumbing modifications.

See Plumbing activity →
Likely60%

Painting / Coatings

Remodels commonly include finish work. Project signal (development project): Remodels commonly include finish work.

See Painting / Coatings activity →
RELATED PERMITS

5 permit records connected to this project