Fire Station 156 & Logistics Facility-san. sewer main
, CASTLE ROCK 80108
Project intelligence
A sanitary sewer main extension is needed to provide sanitary sewerage outfall for the Castle Rock Fire Station 156 & Logistics Facility. The sanitary sewer main extension will be extended from the existing sanitary sewer main at the intersection of
- Class
- CONSTRUCTION DRAWINGS
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 234929303016
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Fire Station 156 & Logistics Facility-san. sewer main
A sanitary sewer main extension is needed to provide sanitary sewerage outfall for the Castle Rock Fire Station 156 & Logistics Facility. The sanitary sewer main extension will be extended from the existing sanitary sewer main at the intersection of
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Plumbing
The public record directly references plumbing work. Project signal (development project): The public record directly references plumbing work.
See Plumbing activity →Site Utilities
The public record directly references site utilities work. Roadway projects can include utility relocation or drainage infrastructure. Project signal (development project): The public record directly references site utilities work. Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Project signal (development project): Roadway work commonly includes paving/asphalt scopes.
See Paving / Asphalt activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (development project): Roadway/bridge work commonly includes concrete structures or flatwork.
See Concrete activity →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (development project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (development project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (development project): Bridge/transportation work may include structural steel.
See Structural Steel activity →Landscaping
Transportation projects often include landscape restoration. Project signal (development project): Transportation projects often include landscape restoration.
See Landscaping activity →