Stroh Road Widening
, Parker
Project intelligence
( Work consists of widening Stroh Road between J Morgan Boulevard and Crowfoot Valley/Motsenbocker Road ) Phase 1 of the project is complete, which includes transferring traffic to the two (2) new lanes with a new bridge over Cherry Creek. Included in phase 1 was the extension of J Morgan Boulevard and widening Stroh Road to the West of the Crowfoot Valley/Motsenbocker Road intersection. The project was completed at the end of August opening all lanes of traffic to the traveling public. The project finished ahead of schedule and under budget. View the project webpage
- Class
- Public Infrastructure
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- Not linked yet
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Stroh Road Widening
( Work consists of widening Stroh Road between J Morgan Boulevard and Crowfoot Valley/Motsenbocker Road ) Phase 1 of the project is complete, which includes transferring traffic to the two (2) new lanes with a new bridge over Cherry Creek. Included in phase 1 was the extension of J Morgan Boulevard and widening Stroh Road to the West of the Crowfoot Valley/Motsenbocker Road intersection. The project was completed at the end of August opening all lanes of traffic to the traveling public. The project finished ahead of schedule and under budget. View the project webpage
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Project signal (capital project): Roadway work commonly includes paving/asphalt scopes.
See Paving / Asphalt activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (capital project): Roadway/bridge work commonly includes concrete structures or flatwork.
See Concrete activity →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (capital project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (capital project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Site Utilities
Roadway projects can include utility relocation or drainage infrastructure. Project signal (capital project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (capital project): Bridge/transportation work may include structural steel.
See Structural Steel activity →Landscaping
Transportation projects often include landscape restoration. Project signal (capital project): Transportation projects often include landscape restoration.
See Landscaping activity →