PACE Parking Garage
, Parker
Project intelligence
(The PACE Parking Garage will be a 3-story parking structure located East of the PACE Center to replace the surface parking lot. The garage contains a total of 295 spaces including some electric vehicle charging spaces. Structurally, the building will be precast concrete double T's with brick veneer panels that compliments the exterior of the PACE Center. An art mural will wrap the West side of the building tying in the art element of the area.) The PACE Parking garage is officially open to the public! The project was turned over mid-January 2026 for public use. There are over 290 free parking stalls within the building.
- Class
- Public Infrastructure
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- Not linked yet
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
PACE Parking Garage
(The PACE Parking Garage will be a 3-story parking structure located East of the PACE Center to replace the surface parking lot. The garage contains a total of 295 spaces including some electric vehicle charging spaces. Structurally, the building will be precast concrete double T's with brick veneer panels that compliments the exterior of the PACE Center. An art mural will wrap the West side of the building tying in the art element of the area.) The PACE Parking garage is officially open to the public! The project was turned over mid-January 2026 for public use. There are over 290 free parking stalls within the building.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Concrete
The public record directly references concrete work. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (capital project): The public record directly references concrete work. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity →Electrical
The public record directly references electrical work. Park projects may include lighting or site electrical work. Project signal (capital project): The public record directly references electrical work. Park projects may include lighting or site electrical work.
See Electrical activity →Masonry
The public record directly references masonry work. Project signal (capital project): The public record directly references masonry work.
See Masonry activity →Paving / Asphalt
The public record directly references paving / asphalt work. Park/trail projects may include paved trails or parking improvements. Project signal (capital project): The public record directly references paving / asphalt work. Park/trail projects may include paved trails or parking improvements.
See Paving / Asphalt activity →Landscaping
Park/open-space projects commonly require significant landscape work. Project signal (capital project): Park/open-space projects commonly require significant landscape work.
See Landscaping activity →Irrigation
Parks/fields commonly require irrigation systems. Project signal (capital project): Parks/fields commonly require irrigation systems.
See Irrigation activity →Fencing
Park/athletic projects often include fencing or gates. Project signal (capital project): Park/athletic projects often include fencing or gates.
See Fencing activity →