CONNECTED PROJECT

Jordan Road/Newlin Gulch Improvements

, Parker

Under ConstructionUnder Construction1 source
PROJECT ANSWER

What is happening at in Parker?

Jordan Road/Newlin Gulch Improvements is a public infrastructure project in Parker, Colorado, currently shown as Under Construction. ConstructionCurrent connects 1 public timeline signal and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.

Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.

Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

Scope: Work consists of widening Jordan Road and the Newlin Gulch bridge between Stonegate Parkway and Lincoln Avenue. The work also includes adding sidewalk on the west side of Jordan Road between Stonegate Parkway and Village Center Drive. Status: Construction is underway with an anticipated overall project completion in late fall of 2026. Work is focused on widening of the Jordan/Newlin Gulch bridge structure. The project was bundled with Lincoln Ave Widening project and is being completed concurrently.

Class
Public Infrastructure
Reported valuation
—
Square feet
—
Parcel SPN
Not linked yet
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

Date unavailable
capital projectSource fact

Jordan Road/Newlin Gulch Improvements

Scope: Work consists of widening Jordan Road and the Newlin Gulch bridge between Stonegate Parkway and Lincoln Avenue. The work also includes adding sidewalk on the west side of Jordan Road between Stonegate Parkway and Village Center Drive. Status: Construction is underway with an anticipated overall project completion in late fall of 2026. Work is focused on widening of the Jordan/Newlin Gulch bridge structure. The project was bundled with Lincoln Ave Widening project and is being completed concurrently.

Under ConstructionParker Capital Improvement Projects
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.

Browse all trades →
Source-backed98%

Concrete

The public record directly references concrete work. Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (capital project): The public record directly references concrete work. Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.

See Concrete activity in Parker →
Likely92%

Landscaping

Park/open-space projects commonly require significant landscape work. Project signal (capital project): Park/open-space projects commonly require significant landscape work.

See Landscaping activity in Parker →
Likely90%

Paving / Asphalt

Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements. Project signal (capital project): Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements.

See Paving / Asphalt activity in Parker →
Likely84%

Excavation / Grading

Roadway work commonly requires excavation and grading. Project signal (capital project): Roadway work commonly requires excavation and grading.

See Excavation / Grading activity in Parker →
Likely82%

General Contractor

Public roadway/transportation work typically requires prime construction coordination. Project signal (capital project): Public roadway/transportation work typically requires prime construction coordination.

See General Contractor activity in Parker →
Likely82%

Irrigation

Parks/fields commonly require irrigation systems. Project signal (capital project): Parks/fields commonly require irrigation systems.

See Irrigation activity in Parker →
Likely65%

Site Utilities

Roadway projects can include utility relocation or drainage infrastructure. Project signal (capital project): Roadway projects can include utility relocation or drainage infrastructure.

See Site Utilities activity in Parker →
Likely58%

Fencing

Park/athletic projects often include fencing or gates. Project signal (capital project): Park/athletic projects often include fencing or gates.

See Fencing activity in Parker →
Likely58%

Structural Steel

Bridge/transportation work may include structural steel. Project signal (capital project): Bridge/transportation work may include structural steel.

See Structural Steel activity in Parker →
Likely48%

Electrical

Park projects may include lighting or site electrical work. Project signal (capital project): Park projects may include lighting or site electrical work.

See Electrical activity in Parker →
Search visibility: this project remains available to site users but is withheld from search-engine indexing until enough distinct source-backed detail is connected.