E470/Parker Road/Twenty Mile Road Mobility Improvements
, Parker
Project intelligence
( Work consists of extension/widening of Twenty Mile with a southbound connection from E-470 through Pine Lane. Work also includes improvements to southbound Parker Road south of E-470 through Pine Lane .) Design is underway with construction anticipated to occur in 2027 pending approval of the 2027 budget.
- Class
- Public Infrastructure
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- Not linked yet
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
E470/Parker Road/Twenty Mile Road Mobility Improvements
( Work consists of extension/widening of Twenty Mile with a southbound connection from E-470 through Pine Lane. Work also includes improvements to southbound Parker Road south of E-470 through Pine Lane .) Design is underway with construction anticipated to occur in 2027 pending approval of the 2027 budget.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Landscaping
Park/open-space projects commonly require significant landscape work. Project signal (capital project): Park/open-space projects commonly require significant landscape work.
See Landscaping activity →Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements. Project signal (capital project): Roadway work commonly includes paving/asphalt scopes. Park/trail projects may include paved trails or parking improvements.
See Paving / Asphalt activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (capital project): Roadway/bridge work commonly includes concrete structures or flatwork. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (capital project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (capital project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Irrigation
Parks/fields commonly require irrigation systems. Project signal (capital project): Parks/fields commonly require irrigation systems.
See Irrigation activity →Site Utilities
Roadway projects can include utility relocation or drainage infrastructure. Project signal (capital project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →Fencing
Park/athletic projects often include fencing or gates. Project signal (capital project): Park/athletic projects often include fencing or gates.
See Fencing activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (capital project): Bridge/transportation work may include structural steel.
See Structural Steel activity →Electrical
Park projects may include lighting or site electrical work. Project signal (capital project): Park projects may include lighting or site electrical work.
See Electrical activity →