Dransfeldt Road Bridge Rehabilitation
, Parker
Project intelligence
( Work consists of rehabilitation/maintenance work on the Dransfeldt Road/Sulphur Gulch bridge .) The project’s design has been completed with construction anticipated to occur in 2027 pending approval of the 2027 budget.
- Class
- Public Infrastructure
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- Not linked yet
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Dransfeldt Road Bridge Rehabilitation
( Work consists of rehabilitation/maintenance work on the Dransfeldt Road/Sulphur Gulch bridge .) The project’s design has been completed with construction anticipated to occur in 2027 pending approval of the 2027 budget.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Project signal (capital project): Roadway work commonly includes paving/asphalt scopes.
See Paving / Asphalt activity →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (capital project): Roadway/bridge work commonly includes concrete structures or flatwork.
See Concrete activity →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (capital project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (capital project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity →Site Utilities
Roadway projects can include utility relocation or drainage infrastructure. Project signal (capital project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity →Structural Steel
Bridge/transportation work may include structural steel. Project signal (capital project): Bridge/transportation work may include structural steel.
See Structural Steel activity →Landscaping
Transportation projects often include landscape restoration. Project signal (capital project): Transportation projects often include landscape restoration.
See Landscaping activity →