Cherry Creek at E-470
, Parker
What is happening at in Parker?
Cherry Creek at E-470 is a public infrastructure project in Parker, Colorado, currently shown as Published. ConstructionCurrent connects 1 public timeline signal and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.
Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.
Project intelligence
Scope: Work consists of channel and bank stabilization the E-470 bridge and Cottonwood Drive. Status: This capital improvement project is under design and permitting. Construction is expected in 2028.
- Class
- Public Infrastructure
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- Not linked yet
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Cherry Creek at E-470
Scope: Work consists of channel and bank stabilization the E-470 bridge and Cottonwood Drive. Status: This capital improvement project is under design and permitting. Construction is expected in 2028.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.
Paving / Asphalt
Roadway work commonly includes paving/asphalt scopes. Project signal (capital project): Roadway work commonly includes paving/asphalt scopes.
See Paving / Asphalt activity in Parker →Concrete
Roadway/bridge work commonly includes concrete structures or flatwork. Project signal (capital project): Roadway/bridge work commonly includes concrete structures or flatwork.
See Concrete activity in Parker →Excavation / Grading
Roadway work commonly requires excavation and grading. Project signal (capital project): Roadway work commonly requires excavation and grading.
See Excavation / Grading activity in Parker →General Contractor
Public roadway/transportation work typically requires prime construction coordination. Project signal (capital project): Public roadway/transportation work typically requires prime construction coordination.
See General Contractor activity in Parker →Site Utilities
Roadway projects can include utility relocation or drainage infrastructure. Project signal (capital project): Roadway projects can include utility relocation or drainage infrastructure.
See Site Utilities activity in Parker →Structural Steel
Bridge/transportation work may include structural steel. Project signal (capital project): Bridge/transportation work may include structural steel.
See Structural Steel activity in Parker →Landscaping
Transportation projects often include landscape restoration. Project signal (capital project): Transportation projects often include landscape restoration.
See Landscaping activity in Parker →