CONNECTED PROJECT · PL23-0001

Homes in North Basin Village at Terrain Phase 2

2819 CASTLE OAKS DRIVE, CASTLE ROCK 80108

PROJECTSPENDING RESUBMITTAL1 source
Project:OverviewTimelineTrades
AT A GLANCE

Project intelligence

CORE Consultants, on behalf of Stratus Terrain, LLC has submitted a plat land use application to subdivide approximately 42.4 acres into 29 single family lots, 2 tracts, associated utility infrastructure and Right-of-Way.

Class
PLAT
Reported valuation
—
Square feet
—
Parcel SPN
234930401002
Zoning
Not linked yet
Land use
Not linked yet
HOW TO READ THIS PAGE

One project, multiple public signals.

The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.

Public-source signal Our interpretation when labeled

Critical decisions should always be verified against the authoritative source linked on the record.

PROJECT TIMELINE

What happened, in order.

Follow the project from earlier public evidence through later construction activity.

2023-03-27
development projectSource fact

Homes in North Basin Village at Terrain Phase 2

CORE Consultants, on behalf of Stratus Terrain, LLC has submitted a plat land use application to subdivide approximately 42.4 acres into 29 single family lots, 2 tracts, associated utility infrastructure and Right-of-Way.

PENDING RESUBMITTALCastle Rock Development Activity Map
Open authoritative source →
TRADE INTELLIGENCE

Likely work scopes on this project

Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.

Browse all trades →
Likely92%

General Contractor

New residential construction typically requires overall trade coordination. Project signal (development project): New residential construction typically requires overall trade coordination.

See General Contractor activity →
Likely82%

Carpentry / Framing

New homes commonly require framing/carpentry. Project signal (development project): New homes commonly require framing/carpentry.

See Carpentry / Framing activity →
Likely82%

Concrete

New homes commonly require foundation and flatwork concrete. Project signal (development project): New homes commonly require foundation and flatwork concrete.

See Concrete activity →
Likely78%

Excavation / Grading

New homes commonly require excavation and grading. Project signal (development project): New homes commonly require excavation and grading.

See Excavation / Grading activity →
Likely76%

Electrical

New homes require electrical systems. Project signal (development project): New homes require electrical systems.

See Electrical activity →
Likely76%

Plumbing

New homes require plumbing systems. Project signal (development project): New homes require plumbing systems.

See Plumbing activity →
Likely74%

HVAC / Mechanical

New homes require HVAC/mechanical systems. Project signal (development project): New homes require HVAC/mechanical systems.

See HVAC / Mechanical activity →
Likely72%

Roofing

New homes require roofing. Project signal (development project): New homes require roofing.

See Roofing activity →
Likely66%

Drywall

New homes commonly require drywall/gypsum finishes. Project signal (development project): New homes commonly require drywall/gypsum finishes.

See Drywall activity →
Likely62%

Flooring / Tile

New homes commonly require flooring/tile work. Project signal (development project): New homes commonly require flooring/tile work.

See Flooring / Tile activity →
Likely62%

Painting / Coatings

New homes commonly require painting/finish work. Project signal (development project): New homes commonly require painting/finish work.

See Painting / Coatings activity →
Likely55%

Landscaping

New-home projects often include landscaping/site restoration. Project signal (development project): New-home projects often include landscaping/site restoration.

See Landscaping activity →