Sunset Point
, Castle Rock
Project intelligence
CORE Consultants, on behalf of Fourth Investment USA, LLC has submitted a Plat land use application to subdivide approximately 274.405 acres into 232 single family lots, 11 tracts, with Tract K for future development, open space (38.495 acres) and as
- Class
- PLAT
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250704300001
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
Sunset Point
CORE Consultants, on behalf of Fourth Investment USA, LLC has submitted a Plat land use application to subdivide approximately 274.405 acres into 232 single family lots, 11 tracts, with Tract K for future development, open space (38.495 acres) and as
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
General Contractor
New residential construction typically requires overall trade coordination. Project signal (development project): New residential construction typically requires overall trade coordination.
See General Contractor activity →Landscaping
Park/open-space projects commonly require significant landscape work. Project signal (development project): Park/open-space projects commonly require significant landscape work.
See Landscaping activity →Carpentry / Framing
New homes commonly require framing/carpentry. Project signal (development project): New homes commonly require framing/carpentry.
See Carpentry / Framing activity →Concrete
New homes commonly require foundation and flatwork concrete. Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): New homes commonly require foundation and flatwork concrete. Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity →Irrigation
Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.
See Irrigation activity →Excavation / Grading
New homes commonly require excavation and grading. Project signal (development project): New homes commonly require excavation and grading.
See Excavation / Grading activity →Electrical
New homes require electrical systems. Park projects may include lighting or site electrical work. Project signal (development project): New homes require electrical systems. Park projects may include lighting or site electrical work.
See Electrical activity →Plumbing
New homes require plumbing systems. Project signal (development project): New homes require plumbing systems.
See Plumbing activity →HVAC / Mechanical
New homes require HVAC/mechanical systems. Project signal (development project): New homes require HVAC/mechanical systems.
See HVAC / Mechanical activity →Roofing
New homes require roofing. Project signal (development project): New homes require roofing.
See Roofing activity →Drywall
New homes commonly require drywall/gypsum finishes. Project signal (development project): New homes commonly require drywall/gypsum finishes.
See Drywall activity →Flooring / Tile
New homes commonly require flooring/tile work. Project signal (development project): New homes commonly require flooring/tile work.
See Flooring / Tile activity →