Foss Swim School-water meter
5650 ALLEN WAY, CASTLE ROCK 80108
Project intelligence
Install a new 2" water meter / line for Foss Swim School tenant finish.
- Class
- CONSTRUCTION DRAWINGS
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 235126206028
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
SIGNS PERMANENT · 17-1199
WALL SIGN AND MONUMENT REPLACEMENT
Open authoritative source →COMMERCIAL TI · 21-0476
SPROUTS NEW MEAT FREEZER BEER COOLER AND PRODUCE BIN
Open authoritative source →Foss Swim School-water meter
Install a new 2" water meter / line for Foss Swim School tenant finish.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid.
Signage
Linked permit 17-1199: The public record directly references signage work. Project signal (permit): The public record directly references signage work.
See Signage activity →General Contractor
Tenant improvement/remodel work commonly requires overall trade coordination. Project signal (development project): Tenant improvement/remodel work commonly requires overall trade coordination.
See General Contractor activity →Electrical
Tenant improvement/remodel projects commonly involve electrical modifications. Project signal (development project): Tenant improvement/remodel projects commonly involve electrical modifications.
See Electrical activity →HVAC / Mechanical
Tenant improvement/remodel projects commonly involve HVAC or mechanical modifications. Project signal (development project): Tenant improvement/remodel projects commonly involve HVAC or mechanical modifications.
See HVAC / Mechanical activity →Plumbing
Tenant improvement/remodel projects often involve plumbing modifications. Project signal (development project): Tenant improvement/remodel projects often involve plumbing modifications.
See Plumbing activity →Drywall
Interior build-outs commonly include partitions and drywall. Project signal (development project): Interior build-outs commonly include partitions and drywall.
See Drywall activity →Painting / Coatings
Interior build-outs commonly include painting and finish work. Project signal (development project): Interior build-outs commonly include painting and finish work.
See Painting / Coatings activity →Flooring / Tile
Interior build-outs commonly include flooring or tile work. Project signal (development project): Interior build-outs commonly include flooring or tile work.
See Flooring / Tile activity →Carpentry / Framing
Interior remodels often include framing or finish carpentry. Project signal (development project): Interior remodels often include framing or finish carpentry.
See Carpentry / Framing activity →Fire Protection
Commercial interior changes can require fire/life-safety modifications. Project signal (development project): Commercial interior changes can require fire/life-safety modifications.
See Fire Protection activity →Cabinetry / Millwork
Tenant improvements often include casework, cabinetry, or architectural millwork. Project signal (development project): Tenant improvements often include casework, cabinetry, or architectural millwork.
See Cabinetry / Millwork activity →Construction Cleaning
Tenant improvements typically require final turnover cleaning before occupancy. Project signal (development project): Tenant improvements typically require final turnover cleaning before occupancy.
See Construction Cleaning activity →7 permit records connected to this project
TUP PORTABLE STORAGE UNIT
16-2068
SIGNS PERMANENTWALL SIGN AND MONUMENT REPLACEMENT
17-1199
COMMERCIAL MISCTEMP HALLOWEEN STORE
17-1720
COMMERCIAL TISPROUTS NEW MEAT FREEZER BEER COOLER AND PRODUCE BIN
21-0476
COMMERCIAL TIFIVE BELOW COMMERCIAL TI
22-0210
SIGNS PERMANENTFIVE BELOW
22-0980
TEMPORARY USE PERMITSPIRIT HALLOWEEN
24-3144