Ford Dealership Addition
1100 S WILCOX STREET, CASTLE ROCK 80104
What is happening at 1100 S WILCOX STREET in CASTLE ROCK?
Ford Dealership Addition is a construction drawings project in CASTLE ROCK, Colorado, currently shown as PROJECTS. ConstructionCurrent connects 5 public timeline signals and 0 related permit records on this page, plus likely trade involvement based on the connected evidence.
Use the timeline and permit links below to verify the underlying public record and understand how the project is progressing.
Project intelligence
Proposed 8,600 sqft building addition to existing Ford Dealership Center to include 12 new service bays and new drive-thru car wash. Building addition over existing parking lot.
- Class
- CONSTRUCTION DRAWINGS
- Reported valuation
- —
- Square feet
- —
- Parcel SPN
- 250514205013
- Zoning
- Not linked yet
- Land use
- Not linked yet
One project, multiple public signals.
The timeline combines evidence that may originally live in separate public systems. Source facts and our own inferred relationships remain visually distinct.
Critical decisions should always be verified against the authoritative source linked on the record.
What happened, in order.
Follow the project from earlier public evidence through later construction activity.
COMMERCIAL MISC · 22-4144
INSTALL GAS LINE FROM METER FOR 2 TEMP HEATERS
Open authoritative source →Ford Dealership Addition
Proposed 8,600 sqft building addition to existing Ford Dealership Center to include 12 new service bays and new drive-thru car wash. Building addition over existing parking lot.
Open authoritative source →Likely work scopes on this project
Built from connected permits, project descriptions and other public signals. A match indicates likely involvement, not an open bid or employment listing.
Elevators / Lifts
Project signal (permit): The public record directly references elevators / lifts work.
See Elevators / Lifts activity in CASTLE ROCK →Paving / Asphalt
The public record directly references paving / asphalt work. Park/trail projects may include paved trails or parking improvements. Project signal (development project): The public record directly references paving / asphalt work. Park/trail projects may include paved trails or parking improvements.
See Paving / Asphalt activity in CASTLE ROCK →Roofing
Project signal (permit): The public record directly references roofing work.
See Roofing activity in CASTLE ROCK →Landscaping
Park/open-space projects commonly require significant landscape work. Project signal (development project): Park/open-space projects commonly require significant landscape work.
See Landscaping activity in CASTLE ROCK →Irrigation
Parks/fields commonly require irrigation systems. Project signal (development project): Parks/fields commonly require irrigation systems.
See Irrigation activity in CASTLE ROCK →Concrete
Park projects often include sidewalks, pads, curbs, or other concrete flatwork. Project signal (development project): Park projects often include sidewalks, pads, curbs, or other concrete flatwork.
See Concrete activity in CASTLE ROCK →Fencing
Park/athletic projects often include fencing or gates. Project signal (development project): Park/athletic projects often include fencing or gates.
See Fencing activity in CASTLE ROCK →Electrical
Park projects may include lighting or site electrical work. Project signal (development project): Park projects may include lighting or site electrical work.
See Electrical activity in CASTLE ROCK →